skip site header
 
 

Schemes of work: Design and technology at key stage 3 Teacher's Guide

APPENDIX 4: PROGRESSION IN DESIGN AND TECHNOLOGY

STRAND D - USING CONTROL YEAR 8

Year 7 - Unit 7D Using control to control a display

Year 8 - Unit 8D Using control for security

Year 9 - Unit 9D Using control for electronic monitoring

Unit 8D Using control for security
Knowledge, skills and understanding

About the unit

Through this unit, pupils should be able to:

  • model a range of locking and opening/closing mechanisms, and include these in their own designs
  • use a modelling system to create strong and stable structures for testing security devices
  • integrate the structural and mechanical elements of a modelling system to create complex working models
  • design computer-controlled systems that control a range of output devices and monitor a range of input signals
  • implement designed computer-controlled systems so that they respond to real signals and control real devices.

Product evaluation

Organise a range of activities that give pupils an opportunity to:

  • examine, describe and evaluate the various ways in which different types of property are kept secure (including electronic, physical and social)
  • investigate a range of approaches to allow authorised access and to warn of security violations
  • explore and evaluate the working of a range of electronically controlled devices, including those that incorporate embedded computer control
  • examine some of the values issues that are raised by introducting security systems.

Design and make assignment

During the DMA, pupils would be expected to:

  • research the background to the setting, survey existing security solutions and use the information they collect to inform their own designing
  • put together a design specification
  • discuss, as a group, how they can use output devices and sensors in their design ideas
  • make preliminary models to explore and test their thinking
  • experiment with alternative designs and model mechanisms to establish correct working before they decide on their final proposal
  • propose appropriate control systems and sub-systems
  • prepare an ordered sequence for managing the task
  • evaluate their product by comparing it with design criteria at chosen stages in its development.

DMAs

8D Safe and sound